Support tuchware
Instructions:
  • HR will mark attendance of all staff only after verifying all approvals in TMS for the respective date are marked.
  • Absent will be marked if tasks for the day are not marked closed or pending.
  • If the Pending Task or Complaint reaches 10 (100%) in the Dashboard, salary will be on hold for the respective employee.
  • Regular Monthly Tasks will be assigned as basic performance tasks and are not required to be updated.
  • Any task, assignment or responsibility has to be updated in TMS beforehand, otherwise the performance will not be measured and will affect the review of the employee.

Instructions:

  • HR will mark attendance of all staff only after verifying all approvals in TMS for the respective date are marked.
  • Absent will be marked if tasks for the day are not marked closed or pending.
  • If the Pending Task or Complaint reaches 10 (100%) in the Dashboard, salary will be on hold for the respective employee.
  • Regular Monthly Tasks will be assigned as basic performance tasks and are not required to be updated.
  • Any task, assignment or responsibility has to be updated in TMF beforehand, otherwise the performance will not be measured and will affect the review of the employee.

SOP - Portal

S. No.SOP TopicDepartmentPriority  
1Office MaintenanceA&FDR  
2Expense ReportingA&FDR ALL
3Recording TransactionsA&FDR  
4Financial ReportingA&FDR  
5Petty Cash ManagementA&FDR  
6Tax Calculation and ReportingA&FDR  
7Returns and RefundsA&FDR all
8Employee OnboardingHRDRDone 
9Employee DischargeHRDRDone 
10Travel Request and AdvanceHRDRDone 
11Reimbursement ProcessingHRDRDone 
12Payroll ProcessingHRDR all
13Employee Advance against SalaryHRDR all
14Leave ManagementHRDRDone 
15Order CreationSalesABDone 
16Picking and PackingLogisticsDR all
17ShippingLogisticsDR all
18Receiving ReturnsLogisticsDR all
19Production Planning and SchedulingProduction   
20Quality ControlQCABDone 
22Annual Maintenance Contract (AMC) ManagementServiceABDone 
23Customer Support-RemoteServiceABDone 
24Customer Support-OnsiteStoreABDone 
25Installation and SetupStoreABDone 
26ReceivingStore   
27Stock AllocationStore   
28Stock Count and ReconciliationStoreAB  
29Purchase ManagementPurchaseABDone 
PETTY CASH MANAGEMENT- STANDARD OPERATING PROCEDURE
StepTaskDescriptionHindiAuthorized OfficialApproval Required
Turn Around Time
1SourceOnce accountant recieves the amount
he has to do proper entry in excel sheet
of the source from where he recieved
the cash
एक बार अकाउंटेंट को राशि प्राप्त हो जाती है
उसे एक्सेल शीट में उचित प्रविष्टि करनी होगी
उस स्रोत का जहाँ से उसने प्राप्त किया
नकद
Accounts Officer  
2Daily ExpensesPrepare the voucher for cash used in daily
expenses above Rs. 100 and do entries
in Zoho.
दैनिक उपयोग में आने वाली नकदी का वाउचर तैयार करें
रुपये से ऊपर खर्च 100 और प्रविष्टियाँ करें
ज़ोहो में.
Accounts Officer  
3Approval for ExpensesIf the amount of expense is more than 500
and approval of director is required then
accounts person will prepare the voucher
and get it signed by director & enter the bill
in Zoho.
अगर खर्च की रकम 500 से ज्यादा है
और तब निदेशक की मंजूरी आवश्यक है
अकाउंट्स व्यक्ति वाउचर तैयार करेगा
और इसे निदेशक द्वारा हस्ताक्षरित करवाएं और बिल दर्ज करें
ज़ोहो में.
Accounts OfficerDirector 
4Record KeepingDaily update all the expense entries in
excel and share the report to HR daily in
evening.
सभी व्यय प्रविष्टियों को दैनिक रूप से अद्यतन करें
एक्सेल करें और रिपोर्ट को प्रतिदिन एचआर को साझा करें
शाम।
Accounts OfficerHR 
5ReconciliationOn every saturday reconcile the petty
cash log with report & remove the errors if
any.
प्रत्येक शनिवार को क्षुद्र का मिलान करें
रिपोर्ट के साथ कैश लॉग करें और त्रुटियों को दूर करें
कोई भी।
Accounts OfficerDirector 
EXPENSE REPORTING – STANDARD OPERATING PROCEDURE
StepTaskDescriptionHindiAuthorized OfficialApproval RequiredTurn Around Time
1Recieving the PO/BillAccounts person will recieve PO/Bill
from purcahse dept
 Accountant  
2Approval on ZohoOnce bill/PO is recieved by accountant
has update it in Zoho & take approval from director.
 AccountantDirector 
3Verification of PaymentOnce bill/PO is approved then verification of payment is done. If the payment is small accountant will do it from Petty cash, otherwise payment is to be done
via Bank.
 AccountantDirector 
4Record KeepingAccountant will make voucher and keep record in Zoho Accountant  
5DocumentationAccountant will instruct office boy to keep all documents
in file.
 Office BoyAccountant 

Comming Soon

RECRUITMENT- STANDARD OPERATING PROCEDURE
StepTaskDescriptionHindiAuthorized OfficialApproval Required
Turn Around Time
1Resource DemandIf there is vacancy or additional staff requirement in any department then concerned manager will inform HR via email mentioning his requirements like job roles & responsibilities, qualification, age & gender.यदि किसी department में vacancy या अतिरिक्त staff की आवश्यकता है, तो संबंधित manager अपनी आवश्यकताओं जैसे job roles & responsibilities, qualification, age & gender का उल्लेख करते हुए HR को email के माध्यम से सूचित करेगा।Department HeadHR ManagerT
2Vacancy ApprovalAfter finalizing the requirement HR will submit JD and Compensation Proposal to the management and get approval for recruitment.आवश्यकताओं को अंतिम रूप देने के बाद HR, JD और Compensation Proposal management को प्रस्तुत करेगा और recruitment के लिए approval प्राप्त करेगा।HR ManagerDirectorT
3Internal TransfersIf vacancy is to be fulfilled internally, it is to be done on immediate basis either by promoting a staff member or shuffling department of any employee.यदि vacancy को आंतरिक रूप से भरा जाना है, तो इसे तुरंत किया जाना चाहिए, या तो किसी staff member को promote करके या किसी employee के department को बदलकर।HR ManagerDirectorT
4Vacancy PublicationIf the vacancy is to be externally fulfilled, HR needs to either share JD with Placement Consultants or upload it on various Job Portals.यदि vacancy को बाहरी रूप से भरा जाना है, तो HR को या तो JD को Placement Consultants के साथ साझा करना होगा या इसे विभिन्न Job Portals पर अपलोड करना होगा।HR ManagerDirectorT+1
5Screening & SelectionThen CV is to be shortlisted and telephonic round is to be taken & coordination for final round of interview is to be done with manager of concerned department.फिर CV को शॉर्टलिस्ट किया जाना चाहिए और टेलीफोनिक राउंड लिया जाना चाहिए और अंतिम इंटरव्यू राउंड के लिए संबंधित department के manager के साथ समन्वय किया जाना चाहिए।Department HeadHR ManagerOn Reciept
6Background CheckAfter feedback & all other formalities is done, finally candidate is recruited.Feedback और अन्य सभी औपचारिकताओं के बाद, अंततः candidate को भर्ती किया जाता है।HR ManagerDirectorT+1
7Employement Offer ReleaseAfter recruitment, offer letter is to be shared with candidate via email.भर्ती के बाद, offer letter को email के माध्यम से candidate के साथ साझा किया जाना चाहिए।HR ManagerDirector 
8Document CheckAsk for his/her all relevant documents mentioned in Offer Letter.Offer Letter में उल्लिखित सभी प्रासंगिक दस्तावेजों के लिए पूछें।HR ManagerDirector 
9Training PreparationBefore his joining in office, ensure that his desk, job responsibilities, processes related to his working & training material is ready for smooth working.कार्यालय में शामिल होने से पहले, यह सुनिश्चित करें कि उसकी desk, job responsibilities, उसके काम से संबंधित प्रक्रियाएँ और training material सुचारू कामकाज के लिए तैयार हैं।HR ManagerHR Manager 
10JoiningHR will coordinate with Admin Officer to collect documents duly signed to prepare employee joining file. HR to provide Employee formats for Police Verification Form and Onboarding Form to complete within 15 days from the joining. Appointment Letter Shall remain on hold until receipt of the same.HR, Admin Officer के साथ समन्वय करेगा ताकि employee joining file तैयार करने के लिए आवश्यक दस्तावेजों को एकत्र किया जा सके। HR, Employee को Police Verification Form और Onboarding Form के प्रारूप प्रदान करेगा, जिन्हें शामिल होने के 15 दिनों के भीतर पूरा किया जाना चाहिए। Appointment Letter तब तक रोक पर रहेगा जब तक कि ये दस्तावेज प्राप्त नहीं हो जाते।Admin OfficerHR Manager 
11InductionHR to conduct an Induction Programme for the new joining employee. Company Profile, HR Policy, Company Targets and Roles and Responsibilities will be explained to the new joinee.HR, नए joining employee के लिए एक Induction Programme आयोजित करेगा। नए joinee को Company Profile, HR Policy, Company Targets और Roles and Responsibilities समझाए जाएंगे।HR ManagerDirector 
12User CreationHR to submit employee details to the Mktg & IT department to create necessary credentials to perform job functions and user creation in various IT portals of the Company.HR, employee के विवरण को Mktg & IT department को सौंपेगा ताकि job functions को करने के लिए आवश्यक credentials बनाए जा सकें और Company के विभिन्न IT portals में user creation किया जा सके।HR ManagerDirector 
13Operational TrainingAdmin Officer to conduct Operational Training of the new joinee where he will be apprised of how entire business process works and about the systems and processes of the Company.Admin Officer नए joinee की Operational Training करेगा, जहाँ उसे entire business process के काम करने के तरीके और Company के systems और processes के बारे में बताया जाएगा।Admin OfficerHR Manager 
14Functional TrainingReporting Manager will conduct in depth functional training regarding day to day tasks, reporting systems, job responsibilities, product training and SOPs concerned to the employee.Reporting Manager employee के day to day tasks, reporting systems, job responsibilities, product training और संबंधित SOPs के बारे में गहन functional training करेगा।Department HeadHR Manager 
15Appointment LetterIssuance of the Appointment Letter post obtaining satisfactory background check, police verification and all pending documents if any.संतोषजनक background check, police verification और सभी लंबित दस्तावेज़ प्राप्त करने के बाद Appointment Letter जारी किया जाएगा।HR ManagerDirector 
16Resignation or TerminationResignation or Termination is initiated by the employee or the company through email or in writing.Resignation या Termination employee या company द्वारा email या लिखित में प्रारंभ की जाती है।EmployeeHR Manager 
17Exit InterviewHR to schedule an Exit Interview of the departing employee with the Director of the Company and coordinate for the same.HR, departing employee का Exit Interview Company के Director के साथ तय करेगा और इसके लिए समन्वय करेगा।HR ManagerDirector 
18Resignation AcceptanceAfter Exit Interview if the employee persists to resign or the management decides not to continue his employment, the resignation is to be formally submitted to Director for acceptance.Exit Interview के बाद यदि employee इस्तीफा देने पर कायम रहता है या management उसके employment को जारी नहीं रखने का निर्णय लेता है, तो resignation को स्वीकार करने के लिए औपचारिक रूप से Director को प्रस्तुत किया जाना चाहिए।Director  
19Resignation Acceptance AcknowledgementOnce the resignation is accepted, HR informs the employee regarding Exit Formalities, Notice Period, Amount to be Paid in Lieu of Notice Period and Conduct expected during Notice Period through Email.Resignation स्वीकार होने के बाद, HR, employee को Email के माध्यम से Exit Formalities, Notice Period, Notice Period के बदले में भुगतान की जाने वाली राशि और Notice Period के दौरान अपेक्षित आचरण के बारे में सूचित करता है।HR ManagerDirector 
20Relieving FormalitiesOn last working day he has to hand over all company assets to Admin Officer. HR to obtain Non Compete and Non disclosure agreement from the departing employee. HR to issue relieving letter to the employee.अंतिम कार्य दिवस पर उसे सभी company assets Admin Officer को सौंपने होते हैं। HR, departing employee से Non Compete और Non disclosure agreement प्राप्त करेगा। HR, employee को relieving letter जारी करेगा।HR ManagerDirector 
21Feed Back InterviewOn last working day HR should take feedback interview of candidate & keep record of that for further improvements, if required.अंतिम कार्य दिवस पर HR को candidate का feedback interview लेना चाहिए और आवश्यकता पड़ने पर आगे सुधार के लिए उसका रिकॉर्ड रखना चाहिए।HR ManagerDirector 
22Full and FinalFull and Final Compensation will be released strictly after one payroll cycle to the employee after ensuring no dues, information or asset handing over is pending from the employee.पूर्ण और अंतिम Compensation employee को relieving की तारीख से 30 दिनों से पहले जारी नहीं की जाएगी। यह सुनिश्चित करने के बाद कि employee से कोई dues, जानकारी या asset सौंपना लंबित नहीं है।HR ManagerDirector 
23Experience Letter & Security ReleaseExperience Letter and Security shall be released after full and final and not before 30 days from the date of relieving. In case of termination notice period depends on management, rest all process is same.Experience Letter और Security, पूर्ण और अंतिम Compensation के बाद और relieving की तारीख से 30 दिनों से पहले जारी नहीं की जाएगी। Termination के मामले में notice period management पर निर्भर करता है, बाकी सभी प्रक्रिया समान है।HR ManagerDirector 
PAYROLL PROCESSING – STANDARD OPERATING PROCEDURE
StepTaskDescriptionHindiAuthorized OfficialApproval Required
Turn Around Time
1Attendance Marking Employee will punch in & punch out on daily basis, if missed
due to network issue inform immediately to HR, so that
attendance can be marked on same day.
चूक जाने पर कर्मचारी दैनिक आधार पर मुक्का मारेंगे और मुक्का मारेंगे
नेटवर्क समस्या के कारण तुरंत एचआर को सूचित करें, ताकि
उपस्थिति उसी दिन अंकित की जा सकेगी।
Employee  
2Attendance ApprovalHR has to daily approve the attendance of employee, if there
is any confusion HR has to clarify in morning meeting & approval
is to be done.
एचआर को प्रतिदिन कर्मचारी की उपस्थिति को मंजूरी देनी होगी, यदि कोई हो
क्या कोई भ्रम है एचआर को सुबह की बैठक और अनुमोदन में स्पष्ट करना होगा
किया जाना है.
HR Manager  
3Advance/LoanIf employee has claimed any travel advance or loan HR has
to cross check that whether there is any previous advance
and then process in Pagarbook accordingly.
यदि कर्मचारी ने एचआर द्वारा किसी यात्रा अग्रिम या ऋण का दावा किया है
यह जांचने के लिए कि क्या कोई पिछला अग्रिम भुगतान हुआ है
और उसके बाद पगारबुक में तदनुसार प्रक्रिया करें।
HR Manager  
4VerificationOn last day of every month HR has to cross check each and
every entry & if there is any query get it cleared on same day
हर महीने के आखिरी दिन एचआर को एक-एक को क्रॉस चेक करना होता है
प्रत्येक प्रविष्टि और यदि कोई प्रश्न हो तो उसे उसी दिन साफ़ कर लें
HR Manager  
5Bill EntryTill 2nd of every month bills of every employee should be
entered in Pagarbook.
हर महीने की 2 तारीख तक हर कर्मचारी का बिल होना चाहिए
पगारबुक में दर्ज किया गया।
HR Manager  
6DeductionTill 3rd of every month deduction related to KPI & Loan is to
be eneterd in Pagarbook & final discussion with Dept head
is to be done related to deductions.
हर महीने की 3 तारीख तक केपीआई और लोन से जुड़ी कटौती होती है
पगारबुक में शामिल हों और विभाग प्रमुख के साथ अंतिम चर्चा करें
कटौती से संबंधित कार्य किया जाना है।
HR Manager  
7FinalizationAfter all entries done in Pagarbook , HR has to finally cross
check all the entries.
पगारबुक में की गई सभी प्रविष्टियों के बाद, एचआर को अंततः क्रॉस करना होगा
सभी प्रविष्टियाँ जांचें.
HR ManagerDirector 
8Process & Report SubmissionFinally process the payroll & submit report to Director.अंत में पेरोल की प्रक्रिया करें और निदेशक को रिपोर्ट प्रस्तुत करें।HR ManagerDirector 
9Payment updateOnce salary is credited in account of all employees, HR has
to enter all the payment details in Pagarbook.
एक बार वेतन सभी कर्मचारियों के खाते में जमा हो जाता है, एचआर के पास है
पगारबुक में सभी भुगतान विवरण दर्ज करने के लिए।
HR ManagerDirector 
APPLYING/TAKING LEAVES- STANDARD OPERATING PROCEDURE
StepTaskDescriptionHindiAuthorized OfficialApproval Required
Turn Around Time
1Approval for Casual LeaveEmployee has to inform his reporting manager in case of
urgency on same day or a day prior.
कर्मचारी को तत्काल आवश्यकता होने पर उसी दिन या एक दिन पहले अपने रिपोर्टिंग मैनेजर को सूचित करना होगा।Department HeadHR Manager 
2Applying in SoftwareAfter getting approval from manager, update leave in softwareमैनेजर से अप्रूवल मिलने के बाद छुट्टी को सॉफ्टवेयर में अपडेट करेंHR ManagerDirector 
3Tenure of CLIn case of emergency employee can only take CL for
maximum 2 consecutive days.
emergency के मामले में कर्मचारी 2दिन की continous
CL ले सकता है
HR ManagerDirector 
4Applying for Sick LeaveIf there is any medical emergency of self employee must inform it to reporting manager
& ask for leave
यदि स्वयं की कोई मेडिकल इमरजेंसी है तो कर्मचारी को रिपोर्टिंग मैनेजर को इसकी सूचना देनी होगी और छुट्टी मांगनी होगीDepartment HeadHR Manager 
 Applying in SoftwareAfter informing to manager, apply leave in softwareमैनेजर को सूचित करने के बाद, सॉफ्टवेयर में छुट्टी के लिए apply करेंHR ManagerDirector 
5Proof for Sick LeaveOn the day of rejoining the office employee should submit
all necessary documents for approval of sick leave.
ऑफिस ज्वाइन करने वाले दिन सारे मेडिकल प्रूफ़ साथ लेकर आएं और रिपोर्टिंग मैनेजर को जमा करेंDepartment HeadHR Manager 
6Approval of Sick LeaveOnce documents are verified by Reporting Manager, same
documents are to be mailed to HR then only Sick Leave will
be approved, otherwise CL if available in software it will be
marked. In any other discrepancy LWP will be marked
रिपोर्टिंग मैनेजर द्वारा दस्तावेजों का verfication किए जाने के बाद,
उन्हीं दस्तावेजों को एचआर को मेल किया जाना चाहिए, तभी बीमारी की छुट्टी स्वीकृत की जाएगी, अन्यथा यदि सॉफ्टवेयर में CL उपलब्ध है तो उसे mark किया जाएगा। किसी अन्य discrepancy में
एलडब्ल्यूपी को mark किया जाएगा
HR ManagerDirector 
7Applying for Earned LeaveA week prior information should be given to manager to
avail EL. If leave is approved by manager then apply in
software.
EL लेने के लिए manager को एक सप्ताह पूर्व सूचना देनी होगी।
यदि manager द्वारा छुट्टी स्वीकृत हो जाती है तो सॉफ्टवेयर में
apply करें।
Reporting
Manager
HR Manager 
8ApprovalOnce leave is updated in Pagarbook, HR will check that
whether balance is available and replacement is available for the period, If yes EL will be approved
otherwise LWP will be marked and same will be informed to
employee.
एक बार leave पगार बुक में अपडेट होने के बाद, HR चेक करेगा कि
आपके पास leaves balance है या नहीं, अगर नहीं तो LWP
मार्क की जावेगी
HR ManagerDirector 
TRAVEL- STANDARD OPERATING PROCEDURE
StepTaskDescriptionHindiAuthorized OfficialApproval Required
Turn Around Time
1Submit Tour PlanSubmit tour plan on Travel Request Form. Properly prepare the tour map mentioning details like locations to be visited, stay at each location if any, mode of travel and specific business objective for which the tour is being proposed.यात्रा अनुरोध प्रपत्र पर यात्रा योजना जमा करें। दौरे के स्थान, यदि कोई हो तो प्रत्येक स्थान पर रुकना, यात्रा का तरीका और विशिष्ट व्यावसायिक उद्देश्य जिसके लिए दौरा प्रस्तावित किया जा रहा है, जैसे विवरणों का उल्लेख करते हुए टूर मैप को उचित रूप से तैयार करें।Employee  
2Apply of Travel AdvanceIf advance for the travel expenses is required mention the same in the tour plan with breakup of required amount of advance. Ensure to submit travel advance request atleast 3 days in advance of the tour date and the location of travel is beyond 100 Kms.यदि यात्रा व्यय के लिए अग्रिम राशि की आवश्यकता है तो अग्रिम राशि की आवश्यक राशि के विवरण के साथ यात्रा योजना में इसका उल्लेख करें। यात्रा अग्रिम अनुरोध यात्रा की तारीख से कम से कम 3 दिन पहले जमा करना सुनिश्चित करें और यात्रा का स्थान 100 किलोमीटर से अधिक हो।Employee  
3Approval from Reporting ManagerGet the tour plan approved by the reporting manager in case of non availability or absence of manager submit to HR for aproval.प्रबंधक की अनुपलब्धता या अनुपस्थिति के मामले में रिपोर्टिंग प्रबंधक द्वारा टूर प्लान को अनुमोदित करवाएं और अनुमोदन के लिए एचआर को भेजें।EmployeeReporting Manager 
4HR ApprovalOnce tour plan is approved by the reporting manager submit it to the HR for further approval and reply to querries raised by the HR, if any.एक बार जब रिपोर्टिंग मैनेजर द्वारा टूर प्लान को मंजूरी दे दी जाती है, तो इसे आगे की मंजूरी के लिए एचआर के पास जमा करें और एचआर द्वारा उठाए गए प्रश्नों, यदि कोई हो, का उत्तर दें।EmployeeHR Manager 
5Forward to AccountsHR will forward the approved tour plan to accounts for payment if no other advance is outstanding for the employee.यदि कर्मचारी के लिए कोई अन्य अग्रिम बकाया नहीं है तो एचआर भुगतान के लिए स्वीकृत टूर प्लान को खातों में भेज देगा।HR ManagerAccountant 
6Payment of AdvanceAccountant will make the payment ensuring the last outstanding advance has already been settled and the amount of advance is in order ortherwise.लेखाकार यह सुनिश्चित करते हुए भुगतान करेगा कि अंतिम बकाया अग्रिम का निपटान पहले ही कर दिया गया है और अग्रिम की राशि क्रम में है।AccountantDirector 
7Updation of advanceAccountant after payement of advance amount will notify HR to update the advance in Pagarbook.अग्रिम राशि के भुगतान के बाद अकाउंटेंट पगारबुक में अग्रिम को अपडेट करने के लिए एचआर को सूचित करेगा।AccountantHR Manager 
8Submission of BillsThe employee will submit proof of travel, proof of task undertaken like closure report of the service etc. to the reporting manager for approval on the travel bill format.कर्मचारी यात्रा बिल प्रारूप पर अनुमोदन के लिए रिपोर्टिंग प्रबंधक को यात्रा का प्रमाण, किए गए कार्य का प्रमाण जैसे सेवा बंद करने की रिपोर्ट आदि प्रस्तुत करेगा।EmployeeReporting Manager 
9Settling AdvanceAccountant will make settlement entry in Zoho Books and forward it to HR for updation in pagarbook.अकाउंटेंट ज़ोहो बुक्स में निपटान प्रविष्टि करेगा और इसे पगारबुक में अद्यतन करने के लिए एचआर को अग्रेषित करेगा।EmployeeAccountant 
10Settlement of Travel AdvanceHR will settle the advance in the pagarbook.एचआर पगारबुक में अग्रिम राशि का निपटान करेगा।AccountantHR Manager 
ORDER CREATION- STANDARD OPERATING PROCEDURE
StepStepDescriptionHindiAuthorized OfficialApproval RequiredTurn Around Time
1Select Product & QuantitySelect Product and Qty from the website. If the product is showig out of stock you can still place the order in backorder stage. You will be updated when the order shall be fulfilled after confirmation of the order.प्रोडक्ट और क्वांटिटी वेबसाइट से सेलेक्ट करें। अगर प्रोडक्ट आउट ऑफ स्टॉक दिख रहा है तो भी आप उसे बैकऑर्डर स्टेज में ऑर्डर कर सकते हैं। ऑर्डर कन्फर्मेशन के बाद आपको ऑर्डर फुलफिल होने की जानकारी दी जाएगी।Customer  
2Apply Discount CouponIf you have a discount coupon apply it at the check out page. You can download and send the cart for additional discount coupons to our marketing department at marketing@tuchware.comअगर आपके पास डिस्काउंट कूपन है तो उसे चेकआउट पेज पर अप्लाई करें। आप कार्ट को डाउनलोड कर सकते हैं और अतिरिक्त डिस्काउंट कूपन के लिए हमारी मार्केटिंग डिपार्टमेंट को marketing@tuchware.com पर भेज सकते हैं।   
3Add Customer DetailsAdd Customer Name and Address as per GST Details. Please note correct billing and shipping name is to be netered and the same shall be reflected in the tax invoice.कस्टमर का नाम और एड्रेस GST डिटेल्स के अनुसार डालें। कृपया ध्यान दें कि सही बिलिंग और शिपिंग नाम एंटर करें और वही टैक्स इनवॉइस में रिफ्लेक्ट होगा।   
4Select Shipping MethodSelect shipping methods available on the website or select a coupon code with free shipping.वेबसाइट पर उपलब्ध शिपिंग मेथड्स को सेलेक्ट करें या फ्री शिपिंग के लिए कूपन कोड चुनें।   
5Confirm OrderCheck all the details entered and confirm the orderडाले गए सभी डिटेल्स चेक करें और ऑर्डर कन्फर्म करें।   
6Make PaymentYou can select through different modes of payment like net banking, credit cards or EMI. You can alternatively opt for COD facility. Please note only cash collection facility is available in COD, so kindly do not select COD for bulk orders.आप नेट बैंकिंग, क्रेडिट कार्ड्स या EMI जैसे विभिन्न पेमेंट मोड्स सेलेक्ट कर सकते हैं। आप विकल्प के रूप में COD फैसिलिटी भी चुन सकते हैं। कृपया ध्यान दें कि COD में केवल कैश कलेक्शन फैसिलिटी उपलब्ध है, इसलिए बल्क ऑर्डर्स के लिए COD ना चुनें।   
7Recieve Payment CofirmationOnce you make the payment you recieve a payment confirmation on your registered email id.पेमेंट करने के बाद आपको आपके रजिस्टर किए गए ईमेल आईडी पर पेमेंट कन्फर्मेशन मिलेगा।   
8Recieve Order UpdateYou will recieve your order confirmation on email and whatsapp and will be notified for further updates.आपको ऑर्डर कन्फर्मेशन ईमेल और व्हाट्सएप पर मिलेगा और आगे के अपडेट्स के लिए सूचित किया जाएगा।   
Quality Control- Trading- Standard Operating Proceedure
StepDescriptionHindiAuthorized OfficialApproval RequiredTurnaround Time
Internal Testing Procedure- InwardInspection of raw materials, components, and parts upon receipt to ensure they meet quality standards. The Process is called Internal Testing Procedure- Inward and is conducted by Quality Technician of the Production Team. This process includes visual, technical and functional testing of the component. The quality technician conducts ITP-I of the component/ product and assign a ITP-I no on the product.raw materials, components, और parts की receipt पर Inspection यह सुनिश्चित करने के लिए किया जाता है कि वे quality standards को पूरा करते हैं। इस Process को Internal Testing Procedure-Inward (ITP-I) कहा जाता है और इसे Production Team के Quality Technician द्वारा संचालित किया जाता है। इस process में component का visual, technical और functional testing शामिल है। Quality Technician component/ product की ITP-I conducts करता है और product पर एक ITP-I no assign करता है।Quality TechnicianProduction manager1-2 days
Internal Testing Procedure- OutwardComprehensive inspection of finished products before they are released for shipment to customers to ensure they meet quality standardsQuality standards को पूरा करने के लिए customers को shipment के लिए release करने से पहले finished products की व्यापक InspectionQuality InspectorProduction manager1-2 days
Non-Conformance ManagementDocumentation and resolution of non-conforming products, including disposition, rework, or rejectionDisposition, rework, या rejection सहित non-conforming products का Documentation और समाधानQuality InspectorProduction manager2-3 days
Calibration and MaintenanceRegular calibration and maintenance of inspection equipment and tools to ensure accuracy and reliabilityAccuracy और reliability सुनिश्चित करने के लिए inspection equipment और tools का नियमित calibration और maintenanceQuality TechnicianProduction managerMonthly
Quality Data AnalysisAnalysis of quality data to identify trends, root causes of defects, and opportunities for improvementTrends, defects के root causes, और सुधार के अवसरों को पहचानने के लिए quality data का AnalysisProduction managerService ManagerWeekly
PURCHASE- STANDARD OPERATING PROCEDURE
StepStepDescriptionHindiAuthorized OfficialApproval RequiredTurn Around Time
1Receive AMC InquiryReceive inquiries for AMC from customers or clients through designated channels such as phone, email, or websitePhone, email, या website जैसे designated channels के ज़रिए customers या clients से AMC के लिए inquiries प्राप्त करें।Support Engineer- RemoteService ManagerWithin 24 hours
2Provide AMC DetailsProvide detailed information about the AMC packages available, including coverage, duration, pricing, and terms and conditionsAMC packages के बारे में detailed information provide करें, जिसमें coverage, duration, pricing, और terms and conditions शामिल हों।Support Engineer- RemoteService ManagerWithin 1 business day
3Customize AMC PackageCustomize the AMC package based on the customer’s requirements, such as Quarterly, Half Yearly, Annualy, add if any additional services required and negotiate payment termsCustomer की requirements के आधार पर AMC package को customize करें, जैसे Quarterly, Half Yearly, Annually, और यदि कोई additional services चाहिए हों तो उन्हें add करें और payment terms negotiate करें।Support Engineer- RemoteService ManagerWithin 2 business days
4Generate QuotationGenerate a quotation for the customized AMC package, including the breakdown of costs, payment schedule, and termsCustomized AMC package के लिए quotation generate करें, जिसमें costs का breakdown, payment schedule, और terms शामिल हों।Support Engineer- RemoteService ManagerWithin 3 business days
5Negotiate and FinalizeNegotiate with the customer on pricing, terms, and any special requests, and finalize the details of the AMC contractCustomer के साथ pricing, terms, और किसी special requests पर negotiation करें, और AMC contract के details को finalize करें।Service ManagerHead of Sales & MarketingWithin 5 business days
6Prepare Contract DocumentsPrepare the necessary contract documents, including the agreement, terms and conditions, and service level agreement (SLA)जरूरी contract documents तैयार करें, जिसमें agreement, terms and conditions, और service level agreement (SLA) शामिल हों।Service ManagerHead of Sales & MarketingWithin 3 business days
7Obtain SignaturesObtain signatures from the customer and authorized signatories on the AMC contract documents, ensuring legal complianceCustomer और authorized signatories से AMC contract documents पर signatures प्राप्त करें, ensuring legal compliance.Service ManagerHead of Sales & MarketingWithin 1 business day
8Schedule Maintenance VisitsSchedule periodic maintenance visits as per the terms of the AMC contract, ensuring proactive upkeep and servicing of smart lock productsAMC contract के terms के अनुसार periodic maintenance visits schedule करें, जिससे smart lock products का proactive upkeep और servicing हो सके।Service ManagerHead of Sales & MarketingAs per contract terms
9Conduct Maintenance VisitsDispatch technicians to the customer’s premises to conduct scheduled maintenance visits, including inspection, cleaning, lubrication, and software updatesScheduled maintenance visits conduct करने के लिए technicians को customer के premises पर dispatch करें, जिसमें inspection, cleaning, lubrication, और software updates शामिल हों।Support Engineer- FieldService ManagerAs per contract terms
10Document Maintenance ActivitiesDocument all maintenance activities performed during the visits, including observations, repairs, replacements, and recommendationsVisits के दौरान perform की गई सभी maintenance activities को document करें, जिसमें observations, repairs, replacements, और recommendations शामिल हों।Support Engineer- FieldService ManagerWithin 1 business day
11Update Customer RecordsUpdate customer records with details of the maintenance visits, service history, and any additional notes or observationsCustomer records को maintenance visits, service history, और किसी additional notes या observations के details के साथ update करें।Support Engineer- FieldService ManagerWithin 1 business day
12Renew AMC ContractInitiate discussions with the customer regarding the renewal of the AMC contract before the expiration date, offering renewal options and incentivesAMC contract की expiration date से पहले customer के साथ renewal के बारे में discussions initiate करें, renewal options और incentives offer करें।Support Engineer- FieldService ManagerWithin 30 days prior to expiry
13Review and Renew ContractReview the terms of the existing AMC contract, negotiate any changes or updates, and finalize the renewal agreement with the customerExisting AMC contract के terms को review करें, किसी changes या updates पर negotiation करें, और customer के साथ renewal agreement को finalize करें।Support Engineer- FieldService ManagerWithin 5 business days prior to expiry
Customer Support-Remote- STANDARD OPERATING PROCEDURE
StepTaskDescriptionHinglishAuthorized OfficialApproval RequiredTurn Around Time
1Receive Service RequestReceive inquiries/ complaints from customers or clients through designated channels such as phone, email, or websiteफोन, ईमेल, या वेबसाइट जैसे डिज़िग्नेटेड चैनल्स के माध्यम से कस्टमर्स या क्लाइंट्स से इनक्वायरी/कंप्लेंट रिसीव करें।Support Engineer- RemoteService ManagerWithin 24 Hrs
2Verify Customer DataVerify customer records/ order details from ZOHO/ OMS. Verify product model, invoice date for warranty eligibility and ensure there is no overdue before providing customer supportZOHO/ OMS से कस्टमर रिकॉर्ड्स/ ऑर्डर डिटेल्स वेरिफाई करें। प्रोडक्ट मॉडल, इनवॉइस डेट को वारंटी एलिजिबिलिटी के लिए वेरिफाई करें और सुनिश्चित करें कि कोई ओवरड्यू न हो, इससे पहले कि कस्टमर सपोर्ट प्रदान करें। अगर कोई ओवरड्यू इनवॉइस है, तो कस्टमर को सलाह दें कि वे ड्यूज क्लियर करें इससे पहले कि सॉल्यूशन या सर्विस के लिए PI प्रदान करें।Support Engineer- RemoteService ManagerWithin 24 Hrs
3Verify Problem StatementThoroughly understand customer problem, categorize it suitably while lodging the Service Ticket.कस्टमर की समस्या को अच्छी तरह से समझें, उसे उचित रूप से कैटेगराइज़ करें और सर्विस टिकट दर्ज करें।Support Engineer- RemoteService ManagerWithin 24 Hrs
4Lodge SRNLodge a service ticket. Ensure Customer received a whatsapp message regarding their ticket issuance.एक सर्विस टिकट दर्ज करें। सुनिश्चित करें कि कस्टमर को उनके टिकट जारी होने के बारे में व्हाट्सएप मैसेज मिला हो।Support Engineer- RemoteService ManagerWithin 24 Hrs
5Provide Template SolutionExplain the template solution from the Customer Support Manual. Give time to the client to try the solution. Assist in any difficulty in following the steps.कस्टमर सपोर्ट मैन्युअल से टेम्प्लेट सॉल्यूशन समझाएं। क्लाइंट को सॉल्यूशन आज़माने का समय दें। स्टेप्स को फॉलो करने में किसी भी कठिनाई में मदद करें।Support Engineer- RemoteService ManagerWithin 24 Hrs
6Arrange Video MeetingIf the problem is not resolved or not identified over voice call and all the above steps are followed. Send a Google meet link to the customer for video call.यदि समस्या वॉइस कॉल पर हल नहीं होती या पहचानी नहीं जाती और ऊपर दिए गए सभी स्टेप्स का पालन किया गया हो, तो कस्टमर को वीडियो कॉल के लिए गूगल मीट लिंक भेजें।Support Engineer- RemoteService ManagerWithin 24 Hrs
7Resolve IssueResolve Customer Issue by providing technical assistance, transferring to respective department, giving basic order and dispatch details, providing PI for basic services and spare parts.तकनीकी सहायता प्रदान करके, संबंधित विभाग में ट्रांसफर करके, बेसिक ऑर्डर और डिस्पैच डिटेल्स देकर, बेसिक सर्विसेज और स्पेयर पार्ट्स के लिए PI प्रदान करके कस्टमर की समस्या हल करें।Support Engineer- RemoteService ManagerWithin 24 Hrs
8Close SRNClose the SRN after ensuring the issue is succesfully resolved. If not escalate to the supervisor.सुनिश्चित करें कि समस्या सफलतापूर्वक हल हो गई है, उसके बाद SRN बंद करें। यदि नहीं, तो सुपरवाइजर को एस्केलेट करें।Support Engineer- RemoteService ManagerWithin 24 Hrs
9Ask for FeedbackSend feedback link to the customer and ask them to review us positively for our service support.कस्टमर को फीडबैक लिंक भेजें और उनसे हमारी सर्विस सपोर्ट के लिए सकारात्मक समीक्षा करने के लिए कहें।Support Engineer- RemoteService ManagerWithin 24 Hrs
PURCHASE- STANDARD OPERATING PROCEDURE
StepTaskDescriptionHindiAuthorized OfficialApproval RequiredTurn Around Time
1Indent for PurchaseInitiate a formal request for goods or services, specifying quantity, quality, and other requirements.सामान या services के लिए औपचारिक अनुरोध शुरू करें, quantity, quality और अन्य आवश्यकताओं को निर्दिष्ट करें।Store ExecutivePurchase ManagerT
2Finalize PIFinalize the proforma invoice with supplier detailing cost, terms of sale, and other relevant details. Submit to Accountant to issue PO in Zohosupplier के साथ proforma invoice को अंतिम रूप दें, जिसमें cost, terms of sale और अन्य प्रासंगिक विवरण शामिल हों।Purchase ManagerT
3Issue Purchase OrderIssue a formal purchase order to supplier, specifying quantities, prices, delivery dates, and terms.supplier को औपचारिक purchase order जारी करें, जिसमें quantities, prices, delivery dates और terms निर्दिष्ट हों।Accounts ExecutiveFinance HeadT
4Process Bank RemittanceArrange and process bank remittance for payment according to agreed terms.सहमति के अनुसार payment के लिए bank remittance की व्यवस्था और प्रक्रिया करें।Accounts ExecutiveFinance HeadT+1
5Purchase Bill LodgementReceive and lodge supplier’s bill or invoice for accounting and payment processing.लेखांकन और payment processing के लिए supplier का bill या invoice प्राप्त करें और जमा करें।Accounts ExecutiveFinance HeadOn Reciept
6Vendor CreditNegotiate and manage vendor credit terms if applicable, allowing deferred payment.vendor credit terms पर negotiation और प्रबंधन करें, यदि लागू हो, तो deferred payment की अनुमति दें।Accounts ExecutiveFinance HeadT+1
7Inform SupplierMaintain communication with supplier regarding purchase order status, payment, and updates.purchase order की स्थिति, payment और updates के संबंध में supplier के साथ communication बनाए रखें।Purchase ManagerT+1
8Confirm PaymentVerify and confirm payment to supplier, ensuring financial obligations are met.supplier को payment की पुष्टि और सत्यापन करें, यह सुनिश्चित करते हुए कि financial obligations पूरे हो गए हैं।Purchase ManagerT+1
9Obtain Packing ListReceive and verify packing list from supplier detailing contents of shipment.supplier से भेजे गए सामान की सामग्री का विवरण देने वाली packing list प्राप्त करें और सत्यापित करें।Purchase ManagerOn Reciept
10Book Pickup/ LogisticsArrange booking for transportation or logistics to collect goods from supplier.supplier से सामान संग्रह के लिए transportation या logistics की booking की व्यवस्था करें।Purchase ManagerPurchase ManagerOn Reciept
11Rate NegotiationNegotiate favorable rates with logistics providers for transportation of goods.माल के transportation के लिए logistics providers के साथ favorable rates पर negotiation करें।Purchase ManagerPurchase Manager
12Confirm BookingConfirm booking with logistics provider to ensure timely pickup and delivery.समय पर pickup और delivery सुनिश्चित करने के लिए logistics provider के साथ booking की पुष्टि करें।Purchase Manager
13Follow up Pick upMonitor pickup process to ensure goods are collected as scheduled.सुनिश्चित करें कि माल को निर्धारित समय के अनुसार एकत्र किया गया है, pickup process की निगरानी करें।Purchase Manager
14Bill of Lading ConfirmConfirm bill of lading issued by carrier acknowledging receipt of goods for shipment.shipment के लिए माल की प्राप्ति की पुष्टि करने वाले carrier द्वारा जारी bill of lading की पुष्टि करें।Purchase Manager
15Obtain CI, PL SupplierObtain commercial invoice (CI) and packing list (PL) from supplier for customs clearance.customs clearance के लिए supplier से commercial invoice (CI) और packing list (PL) प्राप्त करें।Purchase Manager
16Appoint CHAAppoint CHA to handle customs clearance procedures and documentation.customs clearance procedures और documentation को संभालने के लिए CHA appoint करें।Purchase Manager
17Provide DocumentsSubmit necessary documents to CHA for customs clearance, including CI, PL, and other required paperwork.CHA के लिए आवश्यक दस्तावेज़ प्रस्तुत करें, जैसे कि CI, PL, और अन्य आवPurchase ManagerT
18Bill Of Entry/Checklist ConfirmConfirm bill of entry or checklist by customs authorities for legal importation of goods.सीमा संचालनाधिकारियों द्वारा माल के कानूनी आयात के लिए Bill of Entry या Checklist की पुष्टि करें।Accounts ExecutivePurchase ManagerT
19Custom Duty PaymentPay customs duties and taxes applicable for importing goods.माल आयात के लिए लागू होने वाले Custom Duties और Taxes का भुगतान करें।Purchase ManagerFinance HeadT
20Follow up Custom ReleaseFollow up with customs authorities to ensure timely release of goods after clearance.Customs अधिकारियों के साथ समय पर माल की रिलीज़ सुनिश्चित करने के लिए फॉलो अप करें।Purchase ManagerPurchase ManagerOn Reciept
22Submit Freight/ CHA InvoiceSubmit invoices related to freight and CHA services for payment processing.Payment processing के लिए Freight और CHA सेवाओं से संबंधित Invoices प्रस्तुत करें।Purchase ManagerAs per Terms
23Invoice Payment CHAProcess payment for invoices to CHA for their services related to customs clearance.Customs Clearance से संबंधित उनकी सेवाओं के लिए CHA को Invoices का भुगतान करें।Accounts ExecutiveFinance HeadAs per Terms
24Material InwardReceive and accept goods into company’s inventory or storage facility.कंपनी की Inventory या Storage Facility में माल को प्राप्त और स्वीकृत करें।Store ExecutivePurchase ManagerT
25Inward QCConduct quality checks on received goods to ensure they meet specified standards.प्राप्त माल की Quality Checks करें ताकि यह Specified Standards को पूरा करता हो।QC ExecutivePurchase ManagerT
Customer Support- First Installation- STANDARD OPERATING PROCEDURE
S. NoStepDescriptionHinglishAuthorized OfficialApproval RequiredTurnaround Time
1Pre-Installation PreparationGather all necessary tools, equipment, and materials required for the installation, including the smart door lock system components, batteries, screws, and installation manual and cutting diagrams.सभी ज़रूरी टूल्स, इक्विपमेंट, और मटेरियल्स इकठ्ठे करो जो इंस्टालेशन के लिए चाहिए, जैसे की स्मार्ट डोर लॉक सिस्टम के कंपोनेंट्स, बैटरीज, स्क्रूज, इंस्टालेशन मैन्युअल और कटिंग डायग्राम्स।Installation TechnicianInstallation SupervisorBefore commencing installation
2Site Survey and AssessmentConduct a site survey of the door where the smart lock will be installed, assessing the condition, size, and compatibility with the chosen smart lock modelउस दरवाज़े का साइट सर्वे करो जहाँ स्मार्ट लॉक इंस्टाल होगा, दरवाज़े की कंडीशन, साइज, और चुने हुए स्मार्ट लॉक मॉडल की कम्पैटिबिलिटी को असेस करो।Installation TechnicianInstallation SupervisorBefore commencing installation
3Read Installation ManualThoroughly read and understand the installation manual provided by the smart lock manufacturer, familiarizing with the installation steps, requirements, and precautionsइंस्टालेशन मैन्युअल को ध्यान से पढ़ो और समझो जो स्मार्ट लॉक मैन्युफैक्चरर ने प्रोवाइड किया है, इंस्टालेशन स्टेप्स, रिक्वायरमेंट्स, और प्रीकॉशन्स से फैमिलियर हो जाओ।Installation TechnicianInstallation SupervisorBefore commencing installation
4Prepare Door and HardwarePrepare the door and surrounding hardware for installation, ensuring the surface is clean, level, and free from obstructions or defects that may hinder installationदरवाज़े और सराउंडिंग हार्डवेयर को इंस्टालेशन के लिए प्रिपेयर करो, सरफेस को क्लीन, लेवल, और ऑब्स्ट्रक्शन या डिफेक्ट्स से फ्री रखो जो इंस्टालेशन में रुकावट डाल सकते हैं।Installation TechnicianInstallation SupervisorBefore commencing installation
5Install Smart Door LockFollow the step-by-step instructions outlined in the installation manual to install the smart door lock system on the designated door, ensuring proper alignment and secure attachmentइंस्टालेशन मैन्युअल में दिए गए स्टेप-बाय-स्टेप इंस्ट्रक्शंस को फॉलो करके स्मार्ट डोर लॉक सिस्टम को डिज़िग्नेटेड दरवाज़े पर इंस्टाल करो, प्रॉपर अलाइनमेंट और सिक्योर अटैचमेंट सुनिश्चित करो।Installation TechnicianInstallation SupervisorAs per manufacturer instructions
6Secure Batteries and ComponentsInsert batteries into the smart lock and ensure all components are securely attached and functioning properly, including sensors, keypad, and locking mechanismबैटरीज को स्मार्ट लॉक में इंसर्ट करो और सुनिश्चित करो की सभी कंपोनेंट्स सिक्योरली अटैच्ड और प्रॉपरली फंक्शनिंग हैं, इनक्लूडिंग सेंसर, कीपैड, और लॉकिंग मैकेनिज्म।Installation TechnicianInstallation SupervisorAs per manufacturer instructions
7Connect to Software, Application or NetworkConnect the smart door lock system to the designated smart lock network or software, following the setup instructions provided by the companyस्मार्ट डोर लॉक सिस्टम को डिज़िग्नेटेड स्मार्ट लॉक नेटवर्क या सॉफ्टवेयर से कनेक्ट करो, कंपनी द्वारा दिए गए सेटअप इंस्ट्रक्शंस को फॉलो करो।Installation TechnicianInstallation SupervisorAs per manufacturer instructions
8Test FunctionalityTest the functionality of the smart door lock system, including locking and unlocking mechanisms, keypad entry, remote access via smartphone app, and integration with other smart home devicesस्मार्ट डोर लॉक सिस्टम की फंक्शनैलिटी को टेस्ट करो, इनक्लूडिंग लॉकिंग और अनलॉकिंग मैकेनिज्म्स, कीपैड एंट्री, रिमोट एक्सेस वाया स्मार्टफोन ऐप, और इंटीग्रेशन विथ अदर स्मार्ट होम डिवाइसेस।Installation TechnicianInstallation SupervisorAfter installation and setup
9Configure User AccessConfigure user access settings, including programming user codes, assigning permissions, and setting up user profiles for authorized individualsयूजर एक्सेस सेटिंग्स को कन्फिगर करो, इनक्लूडिंग यूजर कोड्स को प्रोग्राम करना, परमिशन्स असाइन करना, और ऑथराइज्ड इंडिविजुअल्स के लिए यूजर प्रोफाइल्स सेटअप करना।Installation TechnicianInstallation SupervisorAfter installation and setup
10Perform System IntegrationIntegrate the smart door lock system with other compatible smart home devices or security systems, such as cameras, alarms, or voice assistants, if applicableस्मार्ट डोर लॉक सिस्टम को दुसरे कम्पैटिबल स्मार्ट होम डिवाइसेस या सिक्योरिटी सिस्टम्स, जैसे कैमरा, अलार्म्स, या वॉइस असिस्टेंट्स के साथ इंटीग्रेट करो, अगर एप्लीकेबल हो।Installation TechnicianInstallation SupervisorAfter installation and setup
11Conduct Customer OrientationProvide a comprehensive orientation to the customer on how to use the smart door lock system effectively, including operating instructions, maintenance tips, and troubleshooting guidanceकस्टमर को स्मार्ट डोर लॉक सिस्टम इफेक्टिवली यूज़ करने का कॉम्प्रिहेन्सिव ओरिएंटेशन दो, इनक्लूडिंग ऑपरेटिंग इंस्ट्रक्शंस, मेंटेनेंस टिप्स, और ट्रबलशूटिंग गाइडेंस।Installation TechnicianInstallation SupervisorAfter installation and setup
12Document Installation DetailsDocument all installation details, including any challenges encountered, modifications made, and customer preferences or special requestsसभी इंस्टालेशन डिटेल्स को डाक्यूमेंट करो, इनक्लूडिंग कोई चैलेंजेस जो एंकाउंटर हुए, मोडिफिकेशन्स जो किये गए, और कस्टमर के प्रेफरेंसेस या स्पेशल रिक्वेस्ट्स।Installation TechnicianInstallation SupervisorAfter installation and setup
Customer Support- Onsite- STANDARD OPERATING PROCEDURE
StepTaskDescriptionHinglishAuthorized OfficialApproval RequiredTurn Around Time 
1Receive Service RequestReceive request from customers or clients through designated channels such as phone, email, or website for the site visitफोन, ईमेल, या वेबसाइट जैसे डिज़िग्नेटेड चैनल्स के माध्यम से साइट विजिट के लिए कस्टमर्स या क्लाइंट्स से रिक्वेस्ट रिसीव करें।Support Engineer- RemoteService ManagerWithin 24 Hrs 
2Verify Customer DataVerify customer records/ order details from ZOHO/ OMS. Verify product model, invoice date for warranty eligibility and ensure there is no overdue before providing customer support. If there is an overdue invoice advise customer to clear the dues before providing the solution or PI for the service.ZOHO/ OMS से कस्टमर रिकॉर्ड्स/ ऑर्डर डिटेल्स वेरिफाई करें। प्रोडक्ट मॉडल, इनवॉइस डेट को वारंटी एलिजिबिलिटी के लिए वेरिफाई करें और सुनिश्चित करें कि कोई ओवरड्यू न हो, इससे पहले कि कस्टमर सपोर्ट प्रदान करें। अगर कोई ओवरड्यू इनवॉइस है, तो कस्टमर को सलाह दें कि वे ड्यूज क्लियर करें इससे पहले कि सॉल्यूशन या सर्विस के लिए PI प्रदान करें।Support Engineer- RemoteService ManagerWithin 24 Hrs 
3Verify Problem StatementThoroughly understand why customer required a site visit. categorize it suitably whether paid visit is requred or customer is eligible for free visit.अच्छी तरह से समझें कि कस्टमर को साइट विजिट की आवश्यकता क्यों है। इसे उचित रूप से कैटेगराइज़ करें कि क्या पेड विजिट की आवश्यकता है या कस्टमर मुफ्त विजिट के लिए पात्र है।Support Engineer- RemoteService ManagerWithin 24 Hrs 
4Lodge SRNLodge a service ticket. Select correct problem statement for site visit, whether paid or free. Assign to a field agent in Service tracking Sheet. Ensure Customer received a whatsapp message regarding their ticket issuance.एक सर्विस टिकट दर्ज करें। साइट विजिट के लिए सही प्रॉब्लम स्टेटमेंट चुनें, चाहे पेड हो या फ्री। सर्विस ट्रैकिंग शीट में एक फील्ड एजेंट को असाइन करें। सुनिश्चित करें कि कस्टमर को उनके टिकट जारी होने के बारे में व्हाट्सएप मैसेज मिला हो।Support Engineer- RemoteService ManagerWithin 24 Hrs 
5Provide Site Visit T&C to the CustomerExplain terms of site visit to the customer. If the site visit is chargeable, explain the cost of visit and inclusions in the site visit.कस्टमर को साइट विजिट के टर्म्स समझाएं। अगर साइट विजिट चार्जेबल है, तो विजिट की लागत और साइट विजिट में शामिल चीज़ों को समझाएं।Support Engineer- RemoteService ManagerWithin 24 Hrs 
6Provide Proforma InvoiceProvide Proforma Invoice to the customer for the SIte Visit if the visit is chargeable. Excalate Service request to Field Agent . Provide order no for the site visit in the service tracking sheet. Discuss preferred date of visit by the customer and mention the same in Service TRacking Sheet for the field agent’s reference.अगर साइट विजिट चार्जेबल है, तो कस्टमर को प्रोफार्मा इनवॉइस प्रदान करें। सर्विस रिक्वेस्ट को फील्ड एजेंट को एस्केलेट करें। सर्विस ट्रैकिंग शीट में साइट विजिट का ऑर्डर नंबर प्रदान करें। कस्टमर द्वारा पसंद की गई विजिट की तारीख पर चर्चा करें और फील्ड एजेंट के संदर्भ के लिए सर्विस ट्रैकिंग शीट में उल्लेख करें।Support Engineer- RemoteService ManagerWithin 24 Hrs 
7Site Visit ScheduleField Agent to contact customer and schedule appointment on the preferred date. If no field agent is available to visit on the customer’s preferred date, advise him the next available date. Reconfirm the siti visit schedule.फील्ड एजेंट कस्टमर से संपर्क करे और पसंद की गई तारीख पर अपॉइंटमेंट शेड्यूल करे। अगर कस्टमर की पसंद की तारीख पर कोई फील्ड एजेंट उपलब्ध नहीं है, तो उन्हें अगली उपलब्ध तारीख बताएं। साइट विजिट शेड्यूल की पुनः पुष्टि करें।Support Engineer- OnsiteService ManagerWithin 24 Hrs 
8Make Travel ArrangementsObtain necessary aprovals and advance from HR department for the travelयात्रा के लिए HR विभाग से आवश्यक अनुमतियाँ और अग्रिम राशि प्राप्त करें।Support Engineer- OnsiteService ManagerWithin 24 Hrs 
9Pre-visit PreparationGather all necessary tools, equipment, and materials required for the installation, including the smart door lock system components, batteries, screws, and installation manual and cutting diagrams.सभी ज़रूरी टूल्स, इक्विपमेंट, और मटेरियल्स इकठ्ठा करें जो इंस्टालेशन के लिए चाहिए, जैसे कि स्मार्ट डोर लॉक सिस्टम के कंपोनेंट्स, बैटरीज, स्क्रूज, इंस्टालेशन मैन्युअल और कटिंग डायग्राम्स।Support Engineer- Onsite   
10Issue Resolution & ReportingReport to the site as per the schedule. Send location through whatsapp to Service Department. Resolve customer issues. Arrange signature and stamp of authorized person in Annexure-D. Send a copy to service department whatsapp group after completion of the task. Obtain approval from supervisor before leaving the customer premises.शेड्यूल के अनुसार साइट पर रिपोर्ट करें। सर्विस डिपार्टमेंट को व्हाट्सएप के माध्यम से लोकेशन भेजें। कस्टमर की समस्याओं का समाधान करें। अधिकृत व्यक्ति के हस्ताक्षर और स्टाम्प की व्यवस्था करें और कार्य पूरा होने के बाद सर्विस डिपार्टमेंट व्हाट्सएप ग्रुप को एक कॉपी भेजें। कस्टमर के परिसर को छोड़ने से पहले सुपरवाइजर से अनुमोदन प्राप्त करें।Support Engineer- Onsite   
12Close SRNClose the SRN after ensuring the issue is succesfully resolved. If not escalate to the supervisor.सुनिश्चित करें कि समस्या सफलतापूर्वक हल हो गई है, उसके बाद SRN बंद करें। यदि नहीं, तो सुपरवाइजर को एस्केलेट करें।Support Engineer- Onsite   
13Ask for FeedbackSend feedback link to the customer and ask them to review us positively for our service support.कस्टमर को फीडबैक लिंक भेजें और उनसे हमारी सर्विस सपोर्ट के लिए सकारात्मक समीक्षा करने के लिए कहें।Support Engineer- Onsite   

QC (Quality Check) Area

Google Form

ITPI